Potters Fields Park, London.

  • pottersfield
  • pottersfield
  • pottersfield
  • pottersfield
  • Completion Date
    October 2016
  • Location
    Potters Fields Park, London.

Requirements:

  • Removal of existing surface to an average depth of 16mm
  • Regulating of existing surface to minimise the possibility of standing water/’ponding’
  • Removal, re-installation, ‘re-pointing’ and strengthening of kerb edgings and cobbled setts
  • Removal and re-installation of drainage ‘slot channels’
  • Installation of requested ‘Rhino Guard’ protection bollard including the required, necessary foundation works
  • 620m2 of Addagrip’s 3mm Scandinavian Addaset Resin Bound Gravel product at an average depth of 16mm