Wembley Stadium, Car Park

  • wembley
  • wembley
  • wembley
  • wembley
  • wembley
  • wembley
  • Project Type:
    Resin Bonded Gravel and Landscaping
  • Completion Date:
    November 2013
  • Project Location:
    Car Park, Wembley Stadium, HA9 0WS
  • Project Area:
    1720 m²

Addagrip’s monthly magazine, their Facebook and Twitter pages stated:

‘’Great result at Wembley. Total Protection – one of our approved contractors – have just installed 2269m² of Addastone Resin Bonded Surfacing in the car park at Wembley. The Addastone system used 1-3mm Chinese Bauxite aggregates in EP Buff Resin, incorporating a geometric grey pattern composed of 1-3mm Guyanan Bauxite in grey resin.

To make the pattern, Total Protection created the perimeters by ‘saw-cutting’ and cutting in the resin as required, to adjoin the colours. The opening date was critical – so the need to work on an area constantly used by other trades was the biggest challenge.

In addition, it was vital that the newly surfaced area was ready for access to the new shopping centre next to the stadium.