Dollar Bay Case Study

Client Name – Total Protection (Landscaping) Ltd

Project Name – Dollar Bay

Completion Date – 17/03/17

Location of works – Canary Wharf in London.

 

  • Total Protection GB Ltd installed 55m² of Orange Wet Pour Safety Surfacing (Rubber Crumb) to some decorative mounds and a small pedestrian area to an eye pleasing garden area within a residential development.
  • The material was laid at a depth of 50mm and it took a total of 2 x days to complete.