Potters Fields Park, London.

  • pottersfield
  • pottersfield
  • pottersfield
  • pottersfield
  • Completion Date
    October 2016
  • Location
    Potters Fields Park, London.

Case Study Download

Potters Fields Park Case Study

Total Protection were selected to carry out resurfacing works at Potters Fields Park in London.
Our operatives began by removing the existing ageing surface dressing to an average depth of 16mm. They then regulated the substrate in order to minimise the possibility of standing water/’ponding’. Removal, re-installation, ‘re-pointing’ and strengthening of kerb edgings and cobbled setts works were also carried out, along with removal and re-installation of drainage ‘slot channels’.
We installed the requested ‘Rhino Guard’ protection bollard including the required, necessary foundation works.
620m2 of Addagrip’s 3mm Scandinavian Addaset Resin Bound Gravel product was then applied at an average depth of 16mm.